Çakmaktepe Power Plant Transport Phase-1

Project Details:

Reverse engineering service was provided for the first phase of the power generation plant transportation project in Aliağa-İzmir, and all the necessary projecting for the transportation of the facility was done by Koryon Engineering. After  3 weeks of laser scanning of the entire facility, 3D and Cloud data were created with 6 weeks of strong office work. In the created Cloud data, the equipment of the system has been labelled  and  documented.  As-built P&IDs(red markup)  of  28  engines  with  9  MW  power  and  2  steam turbines with 20 MW power were delivered by designing the as-built electrical & control system.

Client:

Iltekno                                 

 

Business Area:

Energy Facilities

 

Completion Date:

2021

Location:

Izmir / Turkey

Scope:

Laser scanning, Cloud data creation, 3D as-build modelling, Creating pipe cutting plans