top of page

OKSUT Project -Heap Leach Facility

Project Details:

Electrical and instrumentationengineering studies of the entire facility were carried out as detail engineering work  with  Siemens  at  the  gold  mine  site  in  Kayseri. Detailed  engineering  studies,  equipment  layout  and cable routes were designed considering the requirements of the facility area and customer demands.

Client:

Siemens                                 

 

Business Area:

Industrial Facilities

 

Completion Date:

2020

Location:

Kayseri / Turkey

Scope:

HLF pumps field electrical Layouts, E-House equipment layout, cable cross section calculation reports, cable list and cable routing, Cable, bulk, support MTO’s, Preparation of single line diagram and load lists

bottom of page